Greg chilling at the local bar after a long day of hard work.
We just back from a weekend of working hard on our house. I managed to pull up the old tile from the bathroom and kitchen floor. What a pain in the ass. I got blisters on both fingers!
On Sunday, we tackled one of our nastiest jobs yet. We been having a problem with a backed up drain that causes water to back up in the toilet every time we take a shower. We tried the standard issue snake to get the clog out with no luck. Turns out we needed to rent the "Electric Eel" which is a motor powered large snake with a cutting bit. Friends suggested that the clog was due to roots growing into the pipes.
The electric eel proved to work but not without a lot of mess. We pulled up 4 large root systems that resembled small animals. Seriously gross! The situation got ugly once the electric snake started flinging excess poo up from the drain. I had to make a poop gaurd so that we didn't get soaked. (I know doesn't it make you want to throw-up!). We eventually got it all cleaned out and feel pretty good that the problem is solved. I would have never done the job without Greg. It was way so messy and stinky! Thankfully he's tougher then me. See more images on my flickr page.
Kitchen with tiles down

Katy pulling up the tiles
Greg using the standard issue snake
Rental sign for Electric Eel at Home Depot
First big rootLabels: house renovation, kitchen